Design and Construction of new storm drain piping, detention ponds, glycol storage and treatment, curbing, and other associated drainage elements. The $2.5 million project included piping ranging in size from 54-inch RCP to 8-inch PVC; a 250 foot decent down Gore Hill, energy dissipation structures, diversion structures, glycol treatment aerators, an oil water separator, and new security fencing.
|