WHO WE AREWHAT WE DOOUR PHILOSOPHYLOCATIONSEMPLOYEE LOGIN

Airports & Aviation-Related   >>  White Sulphur Springs Airport

Stelling Engineers is currently administering several improvement projects at the White Sulphur Springs airport. Work includes the design bidding, construction administration, and construction for an Avgas fueling system; pavement maintenance; Preliminary Engineering Investigations; and an Airport Layout Plan (ALP) Revision. The ALO update will incorporate the new fueling facility. Capital Improvement Planning is being conducted which includes coordination with the airport Sponsor to establish planned airport improvements through the Year 2011

Pavement Maintenance

Pavement maintenance is being performed including crack sealing and coal tar pitch emulsion. Engineering services associated with the pavement maintenance includes design, bidding, construction administration, and inspection.

Avgas Fuel System

Purchase and Installation of a New Aviation Fueling System at the White Sulphur Springs Airport to replace the existing mobile fuel truck is currently underway. A FAA approved Business Plan was prepared as a requirement to proceeding with development of a Federal AIP funded, revenue-producing facility. The fueling system includes the supply and installation of a new, 15,000 gallon above-ground fuel tank, an avgas dispensing system, a card reader, an offload pump, associated electrical work, and minor grading for the supply of 100LL aviation fuel. The facility will provide a source of fuel for local aircraft and may potentially attract transient aircraft operating in the area to the airport.